Project Description

Our client required an anti-slip epoxy coating for their commercial kitchen due to heavy usage. We applied the epoxy to the entire kitchen floor before installing appliances like cooking tops, ventilation hoods, and counter tops. We also coated interior elements such as walls and ceilings in the newly prepared restaurant.

What we did

Cost and Time of Project

Project cost was at $55k and completed in 3 weeks.

Challenges + Solutions + Achievements +

We tackled the challenge by ensuring the substrate was completely dry and free of debris so the epoxy would adhere properly. We mopped to remove dry dust and vacuum thoroughly, then rigorously applied the epoxy while controlling the environment against interference from other subcontractors. We easily monitored and completed the interior painting of walls and ceilings because no obstacles stood in our way.